Should you bid on that government contract? A bid/no-bid checklist

Updated Oct 16, 2026 · 7 min read

In this guide

  1. Why decide at all
  2. How to decide whether to bid, step by step
  3. Start with opportunity analysis
  4. The factors to rate
  5. Red flags
  6. Making the call
  7. Registered, eligible and qualified are three different things
  8. Worked example: a small janitorial company
  9. Key terms
  10. Try it
  11. Common questions

Sources

How do I decide whether to bid on a government contract?

Make a short, written bid/no-bid (Go/No-Go) decision before you write anything. Compare the opportunity with your business on the industry code, the set-aside, your skills and past work, any requirement you can’t meet, and the time left, and rate each one Strong, Acceptable, Concern or Unknown. Go ahead only when the concerns are ones you can solve.

Try it on this page

A proposal can take days. So decide early, and on purpose, whether an opportunity deserves that time. This is called a bid/no-bid, or Go/No-Go, decision. Use the checklist below on a real opportunity. Then read how to make the call.

Go/No-Go: is this contract worth pursuing?

Answer the same questions every time, then choose one of three outcomes.

Hypothetical: a landscaping company looks at a grounds maintenance contract.

Go/No-Go questions with a sample answer for each
QuestionAnswer
Does the work match what we do?Yes Mowing and planting, like our current jobs.
Can we compete (set-aside, size, registration)?Yes Small business set-aside; we’re small.
Can we meet every must-have?Not sure A pesticide license is required. Ours may not cover this state.
Do we have time to write a good response?Yes Due in three weeks.
Is it worth the effort and the risk?Yes Three-year contract near our base.
  • Go Yes across the board
  • Need more information One unknown that matters
  • No-Go A blocker, or mostly no

This example: Need more information: confirm the license, then decide.

Sources: Federal contracting guide. Checked Oct 11, 2026. The solicitation decides the details.

The bid/no-bid checklist

Answer Yes, No or Not sure. Your answers stay in this browser and aren’t sent anywhere. “Not sure” is an honest answer: it tells you what to look up.

Answered 0 of 14

1. Can you bid?

Some rules decide who can be awarded the contract at all. Being registered in SAM.gov is one step; the notice can add more.

Do you meet “who can compete”: the set-aside, and any required certification or license? Must-have

A small business set-aside needs you to be small under the notice’s industry code. A HUBZone, 8(a), WOSB or SDVOSB set-aside needs that SBA certification.

Is this your kind of work, and are you small under its industry code (NAICS)?

Each notice lists one NAICS code. Its size standard decides whether you count as small for this contract.

Can you bid without holding a special contract (vehicle)? Answer Yes if none is needed, or if you hold it. Must-have

Some opportunities are open only to companies that already hold a contract such as a GSA Schedule.

Can you meet any security clearance or facility requirements? Answer Yes if there are none. Must-have

Some work needs cleared staff or a cleared facility, which take months to get.

2. Can you do the work?

Matching words on a notice isn’t the same as being able to deliver what it describes.

Do you provide the service or product described, and can you do it well?

Read the statement of work (often Section C), not just the title.

Can you cover all the work yourself, or have a partner lined up for the rest?

On a set-aside, limits apply to how much you can pay subcontractors that aren’t small.

3. Do you have the experience they ask for?

Many solicitations judge you on similar work you’ve done before, called past performance.

Can you show similar work and give the references they ask for?

Private and local government work often counts. Read what “similar size and scope” means in this solicitation.

Do you know this agency or customer, or understand what they care about?

Not required, but it helps you write a stronger proposal.

4. Can you handle it?

A contract that is too big or too far away can hurt a small business even if it wins.

Do you have, or can you hire, the people to do the work on the schedule they want?

Count hours, shifts and sites, alongside the work you already have.

Can you do the work where it is (the place of performance)?

Check every site listed, not just the first one.

5. Can you make the deadline?

A rushed proposal rarely wins. Late proposals are usually not accepted.

Is there enough time to prepare a strong response, including any site visit or meeting?

Check the due date and time zone, the questions deadline, and any site visit dates.

6. Is it worth it?

Every proposal costs time and money. Spend it where you have a real chance.

Can you afford to prepare the proposal and meet insurance, bonding and cash-flow needs?

Government payments can take 30 days or more. Some work needs bonds or set insurance amounts.

Do you have a fair chance against the current contractor and likely competitors?

Look up who holds the work today on USAspending.gov.

Is this worth it to your business: revenue, a new customer, a step toward your goals?

A small first contract can be worth it for the experience alone.

What your answers show

Not enough information yet

Too many key questions are still “Not sure” to judge this opportunity. Find those answers in the notice and the solicitation first. That isn’t a no: it’s what to look up next.

14 questions aren’t answered yet.

Get a full decision brief

Check every answer against the full solicitation, its attachments and amendments on SAM.gov. This doesn’t confirm eligibility or predict an award.

Why decide at all

Without a decision, opportunities drift. Someone starts reading, the deadline gets closer, and a weak proposal goes out because work already started. A Go/No-Go is a short, written review, often under an hour. It ends with go, don’t go, or decide later by a set date.

How to decide whether to bid, step by step

  1. Step 1: Find an opportunity

    Start from a search or a match that looks close to your work.

    Example: A cleaning company finds a custodial contract at a nearby federal building.

    Avoid: Saving everything that mentions your keyword.

    Then: Open the notice.

  2. Step 2: Check whether your company qualifies

    Look at the set-aside, the NAICS code and your SAM.gov registration.

    Example: It’s a total small business set-aside, and the company is small under the code.

    Avoid: Treating “not sure” as “no”. Check it instead.

  3. Step 3: Review the work requirements

    Read what the work is, where, how much and for how long.

    Example: Two buildings, five nights a week, for one year plus options.

    Avoid: Skipping the attachments, where most requirements live.

  4. Step 4: Compare your experience

    Match the work against similar jobs you’ve done, commercial ones included.

    Example: It cleans three office buildings of similar size for private customers.

    Then: Check how the solicitation evaluates past performance.

  5. Step 5: Estimate the cost of preparing a proposal

    Count the hours to read, write, price and review, and who will do them.

    Example: About 40 hours from the owner and office manager.

    Avoid: Forgetting your own time is a cost.

  6. Step 6: Make your decision

    Pursue, investigate one open question, or pass. Write down why.

    Example: Pursue. The one open question, a site visit, goes on the calendar.

    Then: If you pursue, build the compliance matrix next.

Start with opportunity analysis

First look closely, then decide. Lay the notice next to what you know about your business. Does the industry code match your work? Can you compete under the set-aside? Does the description use words from your capabilities? Is there anything you can’t meet, such as a clearance, license, bonding or on-site staffing? How many days are left?

This app’s Fit Analysis makes that comparison with fixed rules you can see. It compares the notice with your company profile. It lists the matches, potential gaps, potential blockers and what needs a closer look. Each is marked known, inferred or unknown. Each shows the reason and the words from the notice behind it. Missing company facts show as “we don’t know yet”, never as a mismatch. It helps you decide, and it doesn’t decide for you. How to evaluate an opportunity covers the comparison step by step.

The factors to rate

A practical Go/No-Go checklist, grouped
GroupQuestions
Opportunity fitDo we do this work? Can we compete under the set-aside? Do we have relevant past performance?
Competitive positionDo we know the agency? Is there a strong incumbent? Do we need a teaming partner?
Delivery readinessDo we have the people, clearances, locations and any required contract vehicle?
Economics and timingIs there time to write a competitive proposal? Can we fund it and meet insurance and bonding? Is it worth it?

Rate each factor Strong, Acceptable, Concern or Unknown. “Unknown” is an honest answer. It tells you what to find out. Too many unknowns close to the deadline is a reason to pass.

Check how the winner will be picked, too. When the lowest acceptable price wins, the lowest-cost bidder has the edge. When the agency weighs price against quality, the strongest plan does. See lowest price or best value.

Red flags

  • A set-aside for a certification you don’t hold, with no teaming partner who does.
  • A requirement you can’t meet in time: a facility clearance, a license, a bond.
  • Too few working days to write a proposal you would be proud of.
  • A notice that seems written around the current holder’s exact way of working, when you don’t know the buyer.
  • Past work you’re asked for and can’t show, even through subcontracts.

To rate your chances with facts, see incumbent analysis before an RFP. It shows how to tell a known current holder from a guess.

Making the call

Write the decision and the reason down. When you look back, your no-bids tell you as much as your wins about where to focus.

Registered, eligible and qualified are three different things

  • Registered: your business has an active SAM.gov registration. Most awards require it. But it doesn’t make you eligible for any one contract.
  • Eligible for the set-aside: you meet “who can compete” on this notice. That may mean being small under its industry code. Or it may mean holding the Small Business Administration (SBA) certification that a HUBZone, 8(a), women-owned (WOSB) or service-disabled veteran-owned (SDVOSB) set-aside needs.
  • Qualified under the solicitation: you meet its own rules. Those might be a license, insurance, a clearance, or a set amount of similar work.

You need all three. Check them in that order. If one fails, the rest of the checklist doesn’t matter for this contract. See self-certified or SBA-certified? for how set-aside status is confirmed.

Worked example: a small janitorial company

The answer isn’t yes or no yet. Nothing rules the company out, but three unknowns could. A day spent checking them costs less than a week on a proposal for work it can’t do. See read the wage determination before you price.

Key terms

Go/No-Go decision
A clear decision to go after a contract opportunity (go) or not (no-go). You make it before you put time into a proposal.
Bid/no-bid
Another name for the Go/No-Go decision.
Incumbent
The company doing the contract now. It often has an edge when the contract is bid again.

See it in the app

Understand the opportunity before spending hours reading and pursuing it. Sample data, real screens.

Step 1 of 4

See the key facts. The facts that decide whether to keep reading come first: stage, deadline, who can compete, industry and place.

Do this in FedPath

See how an opportunity fits your business. Open any opportunity, answer a few questions, and see a fit analysis in seconds. Saving it and running a Go/No-Go assessment come with a free account: [request free beta access](/account/signup/) for an invitation.

Explore opportunitiesRequest free beta access

Free. FedPath is independent. It is not affiliated with, endorsed by, or part of the U.S. government, the Small Business Administration (SBA), SAM.gov, or any federal agency.

Common questions

What is a bid/no-bid decision?

It’s the choice you make before writing a proposal: is this opportunity worth going after? It weighs whether you can bid, whether you can do the work and win, and what bidding would cost.

Why should small businesses evaluate opportunities before bidding?

A proposal can take days. Small teams win more when they spend that time on the few jobs they can really do and win. Answering everything wins less.

What are common reasons not to bid?

You can’t meet who can compete. The work isn’t what you do. You can’t staff it or reach the site. You lack the experience or clearances it needs. Or there isn’t time to write a strong proposal.

Can a new business win a federal contract?

Yes. Many smaller contracts are set aside for small businesses and don’t require federal experience. Read what each solicitation asks for.

What if I don’t have federal past performance?

Similar work for private or local government customers often counts. If a solicitation needs federal experience you don’t have, working under a prime is a way to build it.

How much does preparing a government proposal cost?

Mostly your team’s time. A small business often spends 20 to 60 hours on a simpler bid, and more on a large request for proposals (RFP). The free bid/no-bid tool estimates it from your hours and costs.

What happens after deciding to pursue?

List everything the solicitation requires in a compliance matrix. Assign owners, plan your price, and work back from the deadline. FedPath’s pursuit and Compliance Matrix keep it in one place.

What does Go/No-Go mean in government contracting?

It is the decision to go after an opportunity (go) or not (no-go). You make it after you look at how well it fits your business and what it would take to win.

Does the software decide whether I should bid?

No. The fit analysis suggests ratings from your profile and the notice, and you can change every one. You make the decision.

How long should a bid/no-bid review take?

For most small business opportunities, under an hour. The point is a clear decision early, and a long report isn’t needed.

Coming up

  • Stopgap funding for federal agencies runs out. What it means