Davis-Bacon and certified payroll: the weekly WH-347 for small construction contractors

Updated Oct 25, 2026 · 8 min read

In this guide

  1. When Davis-Bacon applies
  2. Step 1: Read the wage determination in the contract
  3. Step 2: Pay at least weekly, and send a certified payroll each week
  4. What the January 2025 WH-347 asks for
  5. Fringe benefits and apprentices, in plain terms
  6. Primes are responsible for their subs’ payrolls
  7. What happens when payrolls are late or wrong
  8. Keep the records for three years
  9. Before your first federal construction job
  10. Key terms
  11. Common questions

Sources

What is a Davis-Bacon certified payroll?

A certified payroll is a weekly report of each worker’s job classification, hours, pay, fringe benefits and deductions on a federal construction contract, with a signed Statement of Compliance. Davis-Bacon covers construction contracts over $2,000. You can use the Department of Labor’s optional Form WH-347 (from DOL) or your own format with the same information.

On a private job, payroll is between you and your crew. On a federal construction job, the government reads it every week. If you’ve never done certified payroll, the first one can take hours, and the agency can hold your payments until it arrives. Learn what the weekly report asks for, and be ready before your first day on site.

What the contracting officer checks on a certified payroll

Five things on every certified payroll the contracting officer checks first.

  1. Classification (col. 3)

    Match the work done to a line on the wage determination. Separate rows for each classification.

  2. Hours (cols. 4 and 5)

    Daily straight time and overtime. Overtime counts all hours that week, on and off the site.

  3. Rate and fringe (cols. 6A to 6C)

    Base rate paid in cash. Fringe by plan (6B), cash (6C), or both. Together at least the wage determination total.

  4. Apprentices (col. 2, page 2)

    RA only for registered apprentices, within the ratio. Program named on page 2.

  5. Deductions and signature (col. 8, page 2)

    List “other” deductions. Sign the Statement of Compliance by hand or with a valid e-signature.

Sources: Form WH-347, Payroll (Rev. January 2025), and instructions · FAR 22.406-6 · 29 CFR 5.5. Checked Oct 25, 2026. Also fill in the wage determination number, worker entry numbers and the final payroll box.

When Davis-Bacon applies

The Davis-Bacon Act covers federal contracts over $2,000 for building, altering or repairing public buildings or public works, including painting and decorating (Federal Acquisition Regulation, FAR 22.403-1). It covers laborers and mechanics working on the site of the work.

  • Covered: people who do manual or physical work, use tools or do the work of a trade. That includes apprentices and helpers.
  • Not covered: people whose work is mainly office, management or clerical work (29 CFR 5.2).
  • Foremen: a foreman who spends more than 20% of the week doing trade work is covered for that time.

It applies to subcontractors at every tier, too. If you’re a sub on a federal job, the prime will pass these rules down to you.

Step 1: Read the wage determination in the contract

The wage determination lists each classification (carpenter, electrician, laborer, operator and so on) with a base hourly rate and a fringe benefit rate. You can look up construction wage determinations on SAM.gov.

  • Pay each worker for the work they actually do, whatever their title or skill.
  • If someone works in two classifications in a week, you can pay each rate for the hours in it, but only if your records show those hours. If you don’t track them, you owe the highest rate for all hours.
  • If the work you need isn’t listed, ask the contracting officer to add it before the work starts. This is called a conformance request (FAR 52.222-6).
  • Post the wage determination and the Davis-Bacon poster (WH-1321) where workers can see it on site.

For how a wage determination shapes your price, see How to price your first federal quote. Our wage determinations guide covers service contracts, but the pricing logic is the same.

Step 2: Pay at least weekly, and send a certified payroll each week

Workers must be paid at least once a week. For every week with covered work, you send a certified payroll to the contracting agency (29 CFR 5.5(a)(3)(ii)).

  • Use any format. Form WH-347 is optional. Your payroll software’s report is fine if it reports the same information.
  • Never send full Social Security numbers or home addresses. Use an ID such as the last four digits of the SSN. (A prime can still ask its subs for full details for its own records.)
  • Sign it. The Statement of Compliance needs an original or legally valid electronic signature. A scanned or copied signature doesn’t count.

DOL has an online fillable WH-347, linked in the sources below, that works out wages, overtime and fringe credits. It doesn’t store your data or send the form for you. You print or save a PDF and send it to the agency or prime yourself.

What the January 2025 WH-347 asks for

The current form is dated Rev. January 2025 (Office of Management and Budget number OMB 1235-0008, expires January 31, 2028). Page 1 includes:

  • A final payroll box, checked for the last week of work on the project.
  • A prime contractor or subcontractor box.
  • The wage determination number, plus any revision numbers that applied that week.
  • Worker entry number (1A): number each worker’s row, starting at 1, and keep counting across pages.
  • Worker ID (1E): the last four of the SSN or another number unique to that worker.
  • J or RA (column 2): journeyworker or registered apprentice, with the apprentice’s level.
  • Classification (3), daily and weekly hours split into straight time and overtime (4, 5), rates paid (6A), fringe credit (6B), cash paid instead of fringe (6C), gross pay on this project and on all work (7A, 7B), deductions (8) and net pay (9).

Page 2 is the Statement of Compliance. It now also asks for the name of each apprenticeship program and whether it’s registered with DOL or a state agency. It asks for each fringe benefit plan, the hourly credit claimed per worker, and whether the plan is funded or unfunded.

Can you still use the older form? The older form’s government approval ran out on September 30, 2026, according to the federal records site reginfo.gov. Some payroll vendors say agencies stopped accepting it after that date. We didn’t find a DOL notice that says so. Either way, use the January 2025 version now. Check what your agency or prime requires.

Fringe benefits and apprentices, in plain terms

Fringe benefits. The wage determination sets a base rate and a fringe rate. You must pay the base rate in cash. You can meet the fringe rate with payments into real benefit plans (health, pension), with extra cash, or with a mix. On the form, plan credit goes in 6B and cash goes in 6C. An unfunded plan needs DOL approval before you claim credit for it.

Apprentices. You can pay less than the full rate only to apprentices individually registered in a program registered with DOL’s Office of Apprenticeship or a state apprenticeship agency. You must also stay within the program’s ratio of apprentices to journeyworkers. Anyone paid as an apprentice who isn’t registered, or who is over the ratio, must get the full rate for the work they do (29 CFR 5.5(a)(4)).

Primes are responsible for their subs’ payrolls

The prime contractor is responsible for getting certified payrolls from every subcontractor to the agency. It’s also responsible for each sub’s compliance. Under the current rule, if a lower-tier sub underpays its workers, the prime and the sub can both owe the back wages (29 CFR 5.5(a)(6)).

  • If you’re the prime: put the clauses and wage determination in every subcontract. Collect sub payrolls weekly and check them before you send them on.
  • If you’re the sub: expect your prime to ask for payrolls on a set day each week. Late payrolls can hold up your pay from the prime. See How to find subcontracting work.

What happens when payrolls are late or wrong

  • Payments held. If payrolls don’t arrive on time, the contracting officer must hold back an amount from your next payment (FAR 22.406-6). After written notice, the agency can stop further payments until you send them (29 CFR 5.5(a)(3)(iv)).
  • Money withheld for back wages. The agency can withhold enough to cover unpaid wages, from this contract or other federal contracts the same prime holds (FAR 52.222-7; 29 CFR 5.5(a)(2)).
  • Termination and debarment. Breaking these clauses can be grounds for ending the contract and for debarment, which bars you from federal work for a set time. See Suspension and debarment.
  • False statements. Knowingly signing a false Statement of Compliance can lead to civil or criminal charges.

When you send a payroll, the contracting officer checks classifications and rates, fringe payments, hours, deductions and apprentice ratios (FAR 22.406-6). Those are the fields to check twice.

Keep the records for three years

Keep payrolls and basic records, and copies of your certified payrolls, during the work and for at least three years after all work on the prime contract is done (29 CFR 5.5(a)(3)). That includes full names, SSNs, addresses, classifications, rates, hours on each contract, deductions and pay. If you have apprentices, keep proof of their registration.

Before your first federal construction job

  1. Get the wage determination and match each worker to a classification.
  2. Set up payroll to track hours by classification, by day, by project. Track hours on non-federal work separately.
  3. Decide how you’ll meet fringe rates: plan, cash or both. Get plan details, including plan numbers, on file.
  4. Pick a format (WH-347 or a software report) and a weekly sending day that works with your prime.
  5. Price all of this into your bid, including the office time each week.

Key terms

Davis-Bacon Act
The law that says laborers and mechanics on federal construction contracts over $2,000 must get at least the local prevailing wage and fringe benefits.
Wage determination
The Department of Labor’s list, in the contract, of the lowest hourly wage and fringe benefits for each type of construction work in that area.
Classification
The type of work a person does, such as electrician or laborer, matched to a line on the wage determination.
Certified payroll
The weekly payroll report you send on a Davis-Bacon job, signed to say it’s correct.
Statement of Compliance
The signed promise that comes with each certified payroll. On the WH-347 it’s page 2.
Fringe benefits
Health, pension and similar benefits. On a Davis-Bacon job you pay them into a plan, in cash, or a mix.
Registered apprentice
A worker in an apprenticeship program registered with DOL or a state agency. Only registered apprentices can be paid less than the full rate.

Do this in FedPath

See construction projects early. Set up an Opportunity Watch for your construction industry codes (NAICS codes) so you see projects early enough to read the wage determination and set up payroll before you bid.

Open Opportunity Watch

Free. FedPath is independent. It is not affiliated with, endorsed by, or part of the U.S. government, the Small Business Administration (SBA), SAM.gov, or any federal agency.

Common questions

Do I have to use Form WH-347?

No. It’s optional. Your own format must report the same information, with a signed Statement of Compliance.

What if a worker does two kinds of work in a week?

Pay each rate for the hours in each classification, and record those hours. Without records, pay the higher rate for all of them.

Does the overtime column apply?

Hours over 40 in a week, on and off the site, are reported as overtime under the Contract Work Hours and Safety Standards Act when it applies to the contract.